[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"published-projects":3},[4,45],{"id":5,"name":6,"utility":7,"zoningMeetings":8,"confidenceByField":9,"lat":13,"jobsSourceRefs":14,"taxIncentives":15,"jobs":7,"lastReviewedBy":19,"updatedAt":20,"lastReviewedAt":21,"state":22,"powerSourceRefs":23,"communityConcerns":24,"municipality":25,"landAcres":7,"developer":26,"createdAt":21,"locationApproximate":27,"powerDemandMW":7,"status":28,"sizeComparison":7,"environmentalNotes":29,"published":27,"waterDemand":7,"waterSourceRefs":30,"utilitySourceRefs":31,"lng":32,"pjmQueueId":7,"county":33,"slug":5,"environmentalSourceRefs":34,"statusHistory":36,"operator":44},"aws-data-center-keystone-trade-center-falls-township","AWS Data Center - Keystone Trade Center",null,[],{"developer":10,"operator":10,"municipality":10,"environmentalNotes":10,"county":10,"taxIncentives":10,"lat":11,"status":12,"lng":11},"confirmed","estimated","reported",40.18,[],{"summary":16,"sourceRefs":17},"Site designated a Keystone Opportunity Investment Zone (January 2021 - December 2035), offering significant tax abatements.",[18],"iVA8TYlp2DnS6VsRXGT0","patmakesapps@gmail.com","2026-07-07T19:02:33.034Z","2026-07-07T18:47:55.323Z","PA",[],[],"Falls Township","NorthPoint Development",true,"under_construction","Data center campus on the former U.S. Steel Fairless Works site (now the Keystone Trade Center), redeveloped by NorthPoint Development. Land-development plans describe 10 structures of 112,000-217,000 sq ft each, totaling more than 2 million sq ft. Announced by Amazon on June 9, 2025 as part of a broader $20B statewide Pennsylvania investment (the $20B and 1,250-jobs figures are statewide, not specific to this campus).",[],[],-74.83,"Bucks",[35,18],"RPlGr2d4bI53d4zGVc9T",[37,41],{"status":38,"date":39,"sourceRefs":40},"proposed","2025-03-01",[35],{"status":28,"sourceRefs":42,"date":43},[18],"2025-06-09","Amazon Web Services (AWS)",{"id":46,"taxIncentives":7,"jobsSourceRefs":47,"updatedAt":49,"lastReviewedBy":19,"jobs":50,"name":53,"lat":54,"confidenceByField":55,"zoningMeetings":56,"utility":7,"landAcres":57,"municipality":58,"createdAt":59,"developer":60,"state":22,"lastReviewedAt":59,"communityConcerns":61,"powerSourceRefs":62,"environmentalNotes":64,"sizeComparison":7,"waterDemand":7,"waterSourceRefs":65,"published":27,"locationApproximate":27,"status":28,"powerDemandMW":66,"county":67,"operator":7,"environmentalSourceRefs":68,"statusHistory":69,"slug":46,"pjmQueueId":7,"lng":77,"utilitySourceRefs":78},"homer-city-energy-campus-center-township",[48],"68OS9cGKzAN0B1M9Wdqf","2026-07-07T19:02:30.024Z",{"construction":51,"permanent":52},10000,1000,"Homer City Energy Campus",40.51083,{"developer":10,"jobs":12,"county":10,"environmentalNotes":12,"landAcres":10,"municipality":10,"lat":11,"status":10,"powerDemandMW":12,"lng":11},[],3200,"Center Township","2026-07-07T18:47:58.879Z","Homer City Redevelopment (HCR)",[],[63,48],"gP9l5eFqhyC7ThvpOcTR","Redevelopment of the retired Homer City coal plant (closed July 2023; demolition completed March 2025) into an AI\u002FHPC data center campus. Power comes from seven on-site GE Vernova 7HA.02 hydrogen-capable natural gas turbines (~4.4-4.5 GW), with gas supplied by EQT (up to 665,000 MMBtu\u002Fday). Serves the PJM (and NYISO) grids.",[],4400,"Indiana",[63,48],[70,73],{"status":38,"sourceRefs":71,"date":72},[48],"2025-04-02",{"sourceRefs":74,"status":28,"date":76},[75],"ephDGLe5RZurvmECu7Dl","2026-03-31",-79.19361,[]]