[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"county-lehigh":3},{"projects":4,"countyName":15},[5,36,76,109],{"id":6,"waterDemand":7,"municipality":8,"environmentalNotes":7,"state":9,"name":10,"communityConcerns":11,"slug":6,"waterSourceRefs":12,"powerDemandMW":7,"createdAt":13,"landAcres":7,"jobsSourceRefs":14,"lastReviewedAt":13,"county":15,"published":16,"locationApproximate":16,"utility":7,"updatedAt":17,"lat":18,"jobs":7,"sizeComparison":7,"developer":19,"status":20,"taxIncentives":7,"lng":21,"operator":7,"powerSourceRefs":22,"utilitySourceRefs":23,"zoningMeetings":24,"environmentalSourceRefs":25,"pjmQueueId":7,"statusHistory":26,"lastReviewedBy":31,"confidenceByField":32},"2401-w-emaus-ave-data-center-allentown-allentown",null,"Allentown","PA","2401 W Emaus Ave Data Center (Allentown)",[],[],"2026-07-08T18:42:14.406Z",[],"Lehigh",true,"2026-07-08T18:42:14.908Z",40.578,"Quantm Group LLC","proposed",-75.49,[],[],[],[],[27],{"status":20,"sourceRefs":28,"date":30},[29],"oVlHNuXsREGYK0UtlOWc","2026-07-08","patmakesapps@gmail.com",{"status":33,"lat":34,"county":35,"developer":33,"name":33},"reported","estimated","confirmed",{"id":37,"lat":38,"locationApproximate":16,"utility":7,"updatedAt":39,"published":16,"lng":40,"taxIncentives":7,"operator":7,"status":20,"developer":41,"jobs":7,"sizeComparison":7,"powerSourceRefs":42,"utilitySourceRefs":43,"lastReviewedBy":31,"confidenceByField":44,"statusHistory":45,"zoningMeetings":50,"environmentalSourceRefs":62,"pjmQueueId":7,"environmentalNotes":64,"municipality":65,"waterDemand":7,"waterSourceRefs":66,"slug":37,"communityConcerns":67,"name":72,"state":9,"powerDemandMW":7,"createdAt":73,"county":15,"lastReviewedAt":73,"jobsSourceRefs":74,"landAcres":75},"cetronia-road-data-center-upper-macungie-township",40.568,"2026-07-08T18:07:18.030Z",-75.603,"Air Products and Chemicals",[],[],{"zoningMeetings":33,"statusHistory":33,"landAcres":33,"county":35,"locationApproximate":34,"municipality":35,"lat":34,"environmentalNotes":33,"state":35,"communityConcerns":33,"name":35,"developer":35,"status":35,"lng":34},[46],{"sourceRefs":47,"status":20,"date":49},[48],"JJVZwTAEBQ4ymCwL8SFk","2025-11-12",[51,57],{"body":52,"date":53,"outcome":54,"sourceRefs":55},"Upper Macungie Township Zoning Hearing Board","2025-12-16","The board granted Air Products a continuance on its zoning appeal for a proposed data center at 7300 Cetronia Road.",[56],"74cKAhLsczLksHzuU5AJ",{"sourceRefs":58,"outcome":60,"date":61,"body":52},[59],"P1O6U6UzCBfstQgNMsLW","Local reporting says the board unanimously denied Air Products’ request to treat the proposed data center as a similar use in the Light Industrial district.","2026-05-27",[63,56],"Ye2l8hAG7SqhHPnNBudT","The proposal would redevelop Air Products’ former headquarters site at 7300 Cetronia Road into three data-center buildings totaling about 2.6 million square feet. LVPC said the submission lacked sufficient information to evaluate full electrical demand and long-term regional-grid impacts.","Upper Macungie Township",[],[68],{"attributedTo":69,"concern":70,"sourceRefs":71},"Lehigh Valley Planning Commission staff and residents reported by Lehigh Valley Public Media","Planning reviewers and residents raised concerns about electrical demand, regional grid impacts, neighboring land uses, and potential health or quality-of-life effects if impacts are not mitigated.",[63],"Cetronia Road Data Center","2026-07-08T18:07:17.737Z",[],194,{"id":77,"powerSourceRefs":78,"utilitySourceRefs":79,"zoningMeetings":80,"pjmQueueId":7,"environmentalSourceRefs":86,"statusHistory":88,"lastReviewedBy":31,"confidenceByField":91,"published":16,"locationApproximate":16,"utility":7,"updatedAt":92,"lat":93,"sizeComparison":7,"jobs":94,"developer":96,"status":20,"taxIncentives":7,"lng":97,"operator":7,"powerDemandMW":7,"createdAt":98,"landAcres":7,"jobsSourceRefs":99,"lastReviewedAt":98,"county":15,"municipality":100,"waterDemand":7,"environmentalNotes":101,"state":9,"name":102,"communityConcerns":103,"slug":77,"waterSourceRefs":108},"project-atlas-atlas-industrial-data-center-south-whitehall-township",[],[],[81],{"sourceRefs":82,"outcome":84,"date":53,"body":85},[83],"CBjE19B1m6dD9LBox4ul","LVPC accepted plans for the Atlas Industrial data center for later review; local reporting described a six-building hyperscale proposal with an electric substation.","Lehigh Valley Planning Commission",[83,87],"5U19DPubGKnFNzQgTsJP",[89],{"sourceRefs":90,"status":20,"date":53},[83],{"locationApproximate":34,"environmentalNotes":33,"lat":34,"municipality":35,"name":33,"communityConcerns":33,"developer":33,"jobs":33,"state":35,"lng":34,"status":33,"statusHistory":33,"zoningMeetings":33,"county":35},"2026-07-08T18:06:53.825Z",40.615,{"permanent":95},250,"Edged US",-75.532,"2026-07-08T18:06:53.240Z",[87],"South Whitehall Township","The project website says the facility would use a closed-loop cooling system with zero water used for daily cooling operations and would dedicate a new 160-acre park. Local reporting says the submitted plan included six buildings, an electric substation, and about 5.1 million square feet at 2493 N. Cedar Crest Boulevard.","Project Atlas \u002F Atlas Industrial Data Center",[104],{"attributedTo":105,"concern":106,"sourceRefs":107},"Lehigh Valley Planning Commission officials reported by Lehigh Valley Public Media","Planning officials noted that data center proposals require review of electrical availability, water and sewer demands, noise management, air quality monitoring, design, site layout, and community impacts.",[83],[],{"id":110,"powerDemandMW":111,"createdAt":112,"jobsSourceRefs":113,"lastReviewedAt":112,"county":15,"landAcres":7,"waterDemand":7,"municipality":114,"environmentalNotes":115,"slug":110,"waterSourceRefs":116,"state":9,"name":117,"communityConcerns":118,"powerSourceRefs":119,"utilitySourceRefs":121,"lastReviewedBy":31,"confidenceByField":122,"zoningMeetings":123,"environmentalSourceRefs":124,"pjmQueueId":7,"statusHistory":126,"lat":131,"published":16,"locationApproximate":16,"utility":7,"updatedAt":132,"status":128,"taxIncentives":7,"lng":133,"operator":134,"jobs":7,"sizeComparison":7,"developer":134},"tierpoint-allentown-tekpark-data-center-breinigsville",17,"2026-07-08T17:51:04.201Z",[],"Breinigsville","TierPoint lists the facility at 9999 Hamilton Boulevard, Building 4, with more than 122,000 square feet of total space and more than 96,000 square feet of raised floor space.",[],"TierPoint Allentown - TekPark Data Center",[],[120],"YO9r4jsmoqJF45Rg8Nbf",[],{"status":35,"operator":35,"lng":34,"state":35,"developer":35,"name":35,"municipality":35,"lat":34,"environmentalNotes":35,"locationApproximate":34,"county":35,"statusHistory":35,"powerDemandMW":35},[],[125],"PNZnejxzdZCIHRJsTlVE",[127],{"status":128,"sourceRefs":129,"date":130},"operational",[120],"2020-12-10",40.558,"2026-07-08T17:51:04.656Z",-75.625,"TierPoint"]