[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"county-indiana":3},{"projects":4,"countyName":41},[5],{"id":6,"municipality":7,"lastReviewedAt":8,"lastReviewedBy":9,"zoningMeetings":10,"statusHistory":11,"lat":22,"jobs":23,"waterDemand":26,"confidenceByField":27,"communityConcerns":31,"operator":26,"powerSourceRefs":32,"status":20,"utilitySourceRefs":34,"utility":26,"taxIncentives":26,"sizeComparison":26,"landAcres":35,"jobsSourceRefs":36,"name":37,"state":38,"updatedAt":39,"pjmQueueId":26,"environmentalNotes":40,"county":41,"slug":6,"locationApproximate":42,"published":42,"developer":43,"waterSourceRefs":44,"lng":45,"environmentalSourceRefs":46,"createdAt":8,"powerDemandMW":47},"homer-city-energy-campus-center-township","Center Township","2026-07-07T18:47:58.879Z","patmakesapps@gmail.com",[],[12,17],{"status":13,"sourceRefs":14,"date":16},"proposed",[15],"68OS9cGKzAN0B1M9Wdqf","2025-04-02",{"sourceRefs":18,"status":20,"date":21},[19],"ephDGLe5RZurvmECu7Dl","under_construction","2026-03-31",40.51083,{"permanent":24,"construction":25},1000,10000,null,{"county":28,"environmentalNotes":29,"municipality":28,"developer":28,"lng":30,"landAcres":28,"lat":30,"status":28,"jobs":29,"powerDemandMW":29},"confirmed","reported","estimated",[],[33,15],"gP9l5eFqhyC7ThvpOcTR",[],3200,[15],"Homer City Energy Campus","PA","2026-07-07T19:02:30.024Z","Redevelopment of the retired Homer City coal plant (closed July 2023; demolition completed March 2025) into an AI\u002FHPC data center campus. Power comes from seven on-site GE Vernova 7HA.02 hydrogen-capable natural gas turbines (~4.4-4.5 GW), with gas supplied by EQT (up to 665,000 MMBtu\u002Fday). Serves the PJM (and NYISO) grids.","Indiana",true,"Homer City Redevelopment (HCR)",[],-79.19361,[33,15],4400]